Healthcare – St John of God Hospital

Project: St John Of God Hospital, Berwick, Vic

The St John Of God Hospital has been serving the local community since 1939. This first phase of works includes: 30-bed ward in-patient unit; two operating theatres; refurbishment of the day-procedure unit including an endoscopy/day theatre; 10-bay recovery area; refurbishment of the administration, entry, admissions and waiting areas; ambulance bay and drop-off area; chapel; and a 60-space car park. Alerton’s BMS was selected to replace a redundant system.

Scope: Implementation of a fully integrated building automation system using the open BACnet® protocol. This provides event management with reporting and routing of critical alarms and events.

Status: Completed

Specs: Alerton Envision BMS suite with native BACnet® open communication platform, including:

  • web-based centralised monitoring
  • AHUs with reheat coils
  • fan coil unit controls
  • VAV controls
  • chiller water plant
  • boiler systems
  • weather system integration
  • exhaust air systems controls
  • operation theatre controls, and
  • medical gas monitoring.